OPERATIONAL NOTE: Bridge closure for testing: Plimsoll Bridge

30 May 2019

OPERATIONAL NOTE: Bridge closure for testing

Plimsoll Bridge will be fully closed to traffic between 11pm on Saturday 1 June and 5am on Sunday 2 June, with barriers and diversion signs in place.

A number of tests will be carried out on the swing bridge with motorists advised to avoid the area during these times.

We apologise for the inconvenience during these essential works.